New Server Racks

New Server Racks
Server
Image by Ramen Junkie
One of the final projects before leaving my current job. We moved our server equipment to the back area into a cleaner, climate controlled room. This also allowed us to clean up the wiring.

Since these racks are not on the house UPS we’ve got two rack mounted UPS set ups on top.

Also, each rack is on a separate breaker. We had to move the FTP server out of the old room because it kept overloading the circuit having everything on one line.

Comments are closed.